Site work for the Nassau
Subdivision
Pre-Construction flight 4/13/06
Flight Number Two 7/16/06
Flight Number Three 10/3/06
During the logging operation
Just after the clearing and
grubbing, but prior to
the re-grading and stabilization
of the existing lakes
Re-grading and stabilization of
the existing slopes
Onsite fill for pond slopes
Early stages of the roadway
construction
Dust control during the onsite
hauling operation
Mulch berm being installed along
the top of slope to protect the finish
grade of the slope from erosion.
A closer look at the mulch berm
Preparing to set another manhole
for the sewer system
Installing the tracer wire and
warning tape prior to backfilling the 10" water main
|