Site work for the Nassau Subdivision

 

 

 

Pre-Construction flight 4/13/06

 

 

 

 

Flight Number Two 7/16/06

 

 

 

 

Flight Number Three 10/3/06

 

 

 

 

During the logging operation

 

 

 

 

Just after the clearing and grubbing, but prior to

the re-grading and stabilization of the existing lakes

 

 

 

 

Re-grading and stabilization of the existing slopes

 

 

 

 

Onsite fill for pond slopes

 

 

 

 

Early stages of the roadway construction

 

 

 

 

Dust control during the onsite hauling operation

 

 

 

 

Mulch berm being installed along the top of slope to protect the finish

grade of the slope from erosion.

 

 

 

 

A closer look at the mulch berm

 

 

 

 

Preparing to set another manhole for the sewer system

 

 

 

 

Installing the tracer wire and warning tape prior to backfilling the 10" water main